Concrete Contractor in Marysville, WA | Concrete Installation & Repair

For over 15 years, Everett Expert Concrete has replaced gravel and mud with solid concrete across Marysville’s newer subdivisions and older large-lot homes, from two-car driveways to long exposed aggregate walkways.

CONTACT FORM

Fill in the form to get a free initial quotation.

Projects We've Completed In Marysville, WA

Concrete Driveway Installed at a New Marysville Home

The owners of this new home in a growing Marysville subdivision moved in with a gravel pad where the driveway should have been, and every rainy week tracked mud into the garage. We graded the lot, set compacted crushed rock, and poured a 6-inch reinforced driveway wide enough for two cars side by side in front of the single garage door. A diagonal control joint runs corner to corner so the slab handles movement without random cracks, and the driveway pitches toward the street so water drains away from the garage. The driveway was formed and poured in two days.

Side Yard Concrete Walkway Installed at a Marysville Home

This Marysville family had a gravel side yard between the house and the fence that was hard to walk through with a wheelbarrow or garbage cans. They wanted a solid path from the driveway to the backyard. We poured a 4-inch walkway that angles through the side yard and around the fence corner, finished with a light broom texture and a smooth tooled border along every edge. The border frames each panel so the walk looks finished, and the gravel stays on either side for drainage. The walkway was poured in one day.

Exposed Aggregate Walkway Installed at a Marysville Cottage Home

This older Marysville home sits on a large lot with a long lawn, and the only way to the side door was a row of loose stepping stones that sank into the mud each winter. The owners wanted a straight, durable path that matched the natural landscaping. We poured a long exposed aggregate walkway running along the planting bed to the house, set on compacted crushed rock so it stays level over the soft ground. The pebble finish gives natural grip in wet weather and blends in with the bark and plantings. The walkway was finished over two days.